There is no reliable universal fixture-per-square-foot rule. A preliminary estimate starts with floor area, target illuminance, lumens per fixture, coefficient of utilization, and light-loss factor. For a hypothetical 20,000-square-foot warehouse, 30,000-lumen luminaires, a 20 foot-candle target, CU 0.70, and LLF 0.80 produce about 24 fixtures by the lumen method. That is a screening result—not a final count. Mounting height, optics, rack geometry, reflectance, glare, minimum illuminance, and the actual photometric file can change the design.

This guide shows how to calculate a transparent first estimate, why the result is sensitive to its inputs, and how to move from arithmetic to an IES/DIALux design and field check. It does not replace an application-specific lighting standard, electrical review, photometric simulation, or acceptance measurement.

Table of Contents

Quick Answer: Start With Five Inputs, Then Validate the Layout

Direct answer and scope

Use N = (A × E) ÷ (F × CU × LLF), where N is the estimated number of fixtures, A is area in square feet, E is target illuminance in footcandles, F is delivered lumens per fixture, CU is the coefficient of utilization, and LLF is the light-loss factor. Round up to a practical whole number, then test that quantity and its layout in photometric software. The formula estimates average light; it cannot prove minimum light, uniformity, glare, emergency coverage, or electrical capacity.

Conditions that change the answer

  • The work target: an aisle, picking face, inspection bench, loading bay, and circulation path may not need the same illuminance or vertical visibility.
  • Geometry: mounting height above the work plane, bay spacing, ceiling height, obstructions, racking, and the position of the task surface.
  • Optics and delivered lumens: two fixtures with the same wattage can distribute light differently and produce different useful results.
  • Reflectance and maintenance: dark ceilings, dusty surfaces, aging, dirt, temperature, and cleaning practice affect the usable light.
  • The final criterion: average illuminance alone may hide dark aisles, high contrast, glare, or poor vertical illumination.

Decision path

Collect the project inputs, calculate a preliminary range, compare at least two plausible layouts, and then validate the exact fixture, optics, mounting height, reflectances, and light-loss assumptions with an IES-based model. After installation, measure representative points and compare both average and minimum results with the project target.

Inputs Required Before You Use a High Bay Light Calculator

What each input means

The lumen method is an average-illuminance method. It treats the room as a system in which only part of the lumens emitted by the luminaires reaches the work plane, and some of that light is lost through environmental and maintenance effects. IES defines coefficient of utilization as the ratio of lumens reaching the work plane to lumens emitted by the luminaires; CU therefore depends on the luminaire, room geometry, and reflectances rather than being a universal fixture constant.

InputSymbol / unitWhere it comes fromWhy uncertainty matters
Floor or task areaA, ft² or m²Measured plan or zone drawingAveraging the whole building can overstate or understate the task area.
Target average illuminanceE, fc or luxProject brief, applicable criteria, task analysisA higher target increases the calculated count linearly.
Lumens per configured fixtureF, lmExact product file or photometric reportDo not substitute wattage, nominal efficacy, or a different configuration.
Coefficient of utilizationCU, dimensionlessPhotometric data or justified preliminary assumptionChanges with room index, mounting height, optics, and reflectance.
Light-loss factorLLF, dimensionlessMaintenance, dirt, temperature, lumen-maintenance assumptionsA lower LLF raises the quantity needed to maintain the target.
Work plane and heightft or mTask and geometry surveyA floor-only model may miss vertical picking or inspection tasks.
Layout constraintsRows, aisles, obstaclesRacking, beams, sprinklers, doors, cranesThey determine spacing, aiming, edge loss, and service access.

 

The most important distinction is between input power and delivered light. Wattage describes electrical demand; lumens describe photometric output; efficacy is a ratio between them; project performance additionally depends on where the light lands. A high-efficacy fixture is not automatically the best choice if its distribution creates dark vertical faces or excessive glare in the actual building. The same wattage can therefore produce different project results when the optic, mounting geometry, or task surfaces change.

Project variables to collect

Before requesting a quotation or simulation, prepare a dimensioned plan, clear mounting height above the work plane, ceiling and obstruction information, rack and aisle layout, task descriptions, surface reflectances, operating hours, cleaning conditions, ambient temperature, voltage, controls, and any emergency-lighting or certification requirements. Identify whether the target applies to maintained average, minimum, uniformity, or a combination. If the building contains different tasks, create separate zones rather than assigning one number to the entire footprint.

A practical uncertainty check

If the target is 20 fc but the actual task requires 30 fc, the lumen-method result increases by 50 percent before any other change. If the same design uses LLF 0.70 instead of 0.80, the estimated count increases by about 14 percent. These are not minor rounding effects; they show why a calculator should expose its assumptions instead of returning a single unexplained number.

How to Obtain CU and LLF Instead of Guessing Them

Use manufacturer data or a photometric model first

For a real project, do not treat CU = 0.70 or LLF = 0.80 as universal high-bay recommendations. First request the configured luminaire photometric file and any utilization-coefficient or room-index data supplied by the manufacturer. A professional lighting calculation can then derive the relevant utilization behavior from the actual room dimensions, mounting height, reflectances, optic, and work plane. If the product file does not provide a usable CU value, state the preliminary assumption clearly and replace it during IES/DIALux modeling.

Choose LLF from the maintenance conditions

LLF should be traceable to the maintenance plan and the environment: fixture lumen maintenance, dirt or dust accumulation, ambient temperature, cleaning interval, and any other documented loss factor. A clean, controlled space and a dusty or washdown space should not automatically receive the same assumption. The DOE discussion of light-loss factors is a useful technical reference, but the project value still needs to match the selected product, environment, and maintenance basis: https://www.energy.gov/sites/prod/files/2014/10/f18/royer_salc2014.pdf

Show a range when the input is uncertain

When no project-specific data is available, show at least two defensible scenarios rather than one implied standard. In the worked example, CU = 0.70 and LLF = 0.80 are explicitly illustrative assumptions. The sensitivity table shows how the count changes if utilization or maintenance conditions differ; it does not establish a recommended CU or LLF for every warehouse.

How to Choose the Target Illuminance

Start with the visual task, not the building label

Target illuminance should describe what people must see and where they must see it. Define the task surface first: a storage floor, an aisle, a picking face, a packing bench, a loading area, or an inspection surface may require different horizontal or vertical measurement planes. Then identify the applicable market, current project brief, client requirement, and lighting guidance. The current edition of the relevant IES recommended practice or local standard should control the final criterion; the IES standards portal is a starting point for identifying the applicable document: https://www.ies.org/standards/

A practical target-selection workflow

  • Classify the task by visual detail, contrast, speed, occupancy, and safety consequence.
  • Set the measurement plane and distinguish maintained average from minimum illuminance and uniformity requirements.
  • Check the applicable current regional guidance, client specification, occupational requirement, and any energy or control requirement.
  • Separate zones with materially different tasks instead of averaging the whole building.
  • Record the source and version of the target in the calculation so another reviewer can audit it.

Why this avoids false precision

This workflow intentionally does not publish one “warehouse lux” number for every application. A target is meaningful only with its task, work plane, maintenance basis, and acceptance criterion. If the project brief does not specify a target, the estimator should flag the gap and obtain the responsible engineer, owner, or applicable standard before converting area into a fixture count.

Preliminary Lumen Method: The High Bay Light Quantity Formula

Metric definition

For a uniform preliminary screen, use:

N = (A × E) ÷ (F × CU × LLF)

For metric units, use area in m² and target illuminance in lux. For imperial units, use square feet and footcandles. Keep the unit system consistent. The numerator represents the lumens required at the work plane. The denominator represents the maintained useful lumens contributed by one configured luminaire after utilization and light-loss assumptions.

Variables and assumptions

A project input should be measured, not inferred from the building name. E should be tied to the visual task and the governing project criteria. F must match the exact fixture, power setting, CCT, optic, driver, and operating condition being considered. CU should come from applicable photometric information or be stated as a conservative preliminary assumption. LLF should reflect the maintenance plan and environmental conditions; it is not a decorative safety margin.

Worked quantitative example

Illustrative example only: assume a rectangular warehouse zone of 20,000 ft², a maintained average target of 20 fc, a hypothetical configured fixture output of 30,000 lm, CU = 0.70, and LLF = 0.80.

Step 1 — Required lumens at the work plane: 20,000 ft² × 20 lm/ft² = 400,000 lm. Because 1 foot-candle equals 1 lumen per square foot, multiplying area by footcandles produces lumens.

Step 2 — Maintained useful lumens per fixture: 30,000 lm × 0.70 × 0.80 = 16,800 effective lumens.

Step 3 — Preliminary count: 400,000 ÷ 16,800 = 23.81 fixtures.

Step 4 — Round up: 24 fixtures is the arithmetic screening count. It is not yet the installation design because the 24 fixtures could be arranged in ways that produce very different minimum illuminance, uniformity, glare, and vertical light.

ScenarioTarget ECULLFCalculated NRounded screening count
Base assumption20 fc0.700.8023.8124
Higher target30 fc0.700.8035.7136
Higher losses20 fc0.700.7027.2128
Lower utilization20 fc0.600.8027.7828
Higher target + lower LLF30 fc0.700.7040.8241

 

The sensitivity table is more useful than a fixture-per-area slogan. It shows which assumptions dominate the result and gives the estimator a range to test. The example does not identify a real warehouse, fixture, standard, energy price, savings percentage, or payback period.

Decision limit

Use the lumen method to screen fixture families, approximate connected load, and identify whether the project is likely to require a low, medium, or high quantity. Do not use it to claim that every point in the room meets the target. A final design needs the exact photometric file, room geometry, mounting locations, surface reflectances, maintenance assumptions, and the project acceptance criteria.

Example Estimates for Common Warehouse Sizes

The following are illustrative screening estimates, not installation standards. Every row uses the same assumptions as the worked example: 20 fc maintained average, 30,000 lm per configured fixture, CU = 0.70, and LLF = 0.80. The rounded count is calculated as area × 20 ÷ 16,800 and must still be tested against geometry, minimum illuminance, uniformity, vertical visibility, and the exact IES file.

Zone areaRequired lumens at work planeCalculated countRounded screening countApprox. connected load at 200 W/fixture*
5,000 ft²100,000 lm5.9561.2 kW
10,000 ft²200,000 lm11.90122.4 kW
20,000 ft²400,000 lm23.81244.8 kW
50,000 ft²1,000,000 lm59.526012.0 kW

*The 200 W value is a separate illustrative electrical assumption, not a claim about the 30,000-lumen example fixture. Use the exact configured input wattage for a real load calculation. If the target changes to 30 fc, each count in this table increases by 50 percent before layout and zoning are reconsidered.

Why Square-Foot Rules Can Fail

Averages do not show the whole visual environment

A square-foot rule assumes that area is a sufficient proxy for lighting demand. It is not. A warehouse with high open storage, a dense rack aisle, and a quality-inspection station may have the same floor area but different visual tasks. The required light may need to reach vertical labels, pallet faces, machine surfaces, or pedestrian routes—not only a horizontal floor plane.

Distribution also matters. A narrow optic can place more candela along an aisle and less across adjacent racks; a wide optic can reduce hot spots but may send more light toward unwanted surfaces. At greater mounting height, the same beam spreads over a larger footprint and loses intensity at the task plane. The correct comparison is therefore fixture plus optic plus geometry, not wattage or square footage alone.

Common failure modes

  • Using nominal lumens from a family page when the selected power, optic, temperature, or control setting has a different output.
  • Applying one target to storage, picking, loading, and inspection areas without defining the visual task.
  • Ignoring dark ceilings, rack faces, dust, temperature, or maintenance access when choosing CU and LLF.
  • Adding fixtures until the average looks acceptable while failing to review minimum illuminance and uniformity.
  • Assuming a higher-lumen fixture is always better, even when glare, contrast, or vertical visibility is the actual problem.

What to do instead

Divide the facility into functional zones, calculate each zone with explicit inputs, and model the candidate layouts. If the final count is constrained by budget, compare a lower quantity at higher output with a larger quantity at lower output using the same target, distribution, connected load, maintenance assumptions, and acceptance criteria. This makes the tradeoff visible and auditable.

Quantity Versus Spacing and Uniformity

Geometry and target surfaces

The number of fixtures is only half of the design. The other half is where they are installed. Record mounting height above the relevant work plane, row direction, aisle centerlines, obstructions, edge distances, and whether the task is horizontal, vertical, or both. In a racked facility, placing fixtures over aisle centerlines may support wayfinding and floor visibility, while vertical face lighting may require a different distribution or row relationship.

Distribution and overlap

Every photometric distribution creates a pattern of intensity. Adjacent patterns must overlap sufficiently to avoid dark bands, but excessive overlap can produce hot spots and glare. Beam angle can be a useful preliminary descriptor, yet it cannot replace the candela distribution in the actual IES file. Reflectance, mounting height, fixture tilt, and the edge of the modeled zone all affect the result.

Compare plausible layouts

Layout optionPotential advantageTradeoff to test
Fewer higher-output fixturesLower fixture count and fewer mounting pointsLarger spacing, stronger hot spots, more sensitivity to edge loss and glare
More lower-output fixturesMore overlap and potentially better uniformityHigher fixture count, more wiring and maintenance points, different connected load
Aisle-centered rowsDirect alignment with circulation and rack aislesMay leave cross-aisle or vertical faces underlit
Grid across the whole zoneMore even horizontal coverage in open areasMay waste light over racks or conflict with structure and services

 

A valid final comparison should report maintained average, minimum, uniformity ratio, glare-related observations, vertical results where relevant, connected load, control assumptions, and the number of fixtures. Do not select the option with the highest average alone.

IES validation requirements

Request the exact IES or equivalent photometric file for the configured model. Confirm the file matches the selected power, optic, CCT, driver, and control state. Model the actual room dimensions, mounting coordinates, reflectances, obstructions, maintenance assumptions, and work planes. Review average and minimum illuminance, uniformity, isolux contours, vertical surfaces, glare indicators where applicable, and emergency or control zones. DIALux or another suitable tool can replace the lumen-method assumptions with geometry-specific results; it still depends on accurate inputs.

Separate Zones Instead of Averaging the Building

Operating context and visual task

A building label such as “warehouse” does not define one lighting requirement. Storage aisles, order picking, packing, inspection, charging, loading, offices, and circulation involve different tasks and obstruction patterns. Start with what workers must see, where they stand, and which surfaces carry information.

Environmental and mechanical conditions

Classify dust, moisture, washdown, impact, temperature, corrosion, access limitations, and cleaning practice before selecting the fixture. IP is a protection rating, not a complete statement of suitability for every environment; certification and hygiene requirements must be tied to the exact model and configuration. For food-processing or high-washdown spaces, verify the applicable sanitary documentation rather than inferring it from an IP value.

Project input checklist

  • Dimensioned floor plan and ceiling height
  • Mounting height above each work plane
  • Racking, aisle, machine, crane, sprinkler, and service locations
  • Task targets and required horizontal/vertical measurement planes
  • Surface reflectances and environmental maintenance conditions
  • Input voltage, controls, emergency requirements, and operating schedule
  • Required certifications, market, temperature, cleaning, and impact conditions

The defensible decision is not “this building needs 40 lights.” It is “zone A needs a modeled arrangement of X fixtures under these assumptions; zone B needs a different arrangement because its task and geometry are different.”

Select Candidate FY LIGHTING Fixtures After Defining the Requirements

Confirmed standard configuration

FY LIGHTING offers several current industrial families that may be evaluated for different high-bay, linear, food-area, and tri-proof applications. The correct family depends on the environment and geometry; the following figures are product-family facts, not a universal recommendation.

SeriesConfirmed public range / characteristicsUse as a screening question
HB-E95/125/160/225/320 W; standard 160 lm/W; custom high-efficiency version up to 183 lm/W; IP44; 120°Is the space relatively dry, and does a linear distribution suit the task?
HB-F100/125/150/200/300/400 W; standard 160 lm/W; custom high-efficiency version up to 183 lm/W; IP44; 120°Does the higher-power linear family fit mounting height and layout constraints?
HB-C80/120/160/200/300 W; 12,000–45,000 lm; 160 lm/W; IP69K; multiple symmetric/asymmetric opticsDoes the application require a food-area or washdown-oriented configuration with the relevant documentation?
HBG85/135/180/220/280 W; 14,450–47,600 lm; 170 lm/W; IP65; 120°; optional sensor and up to 90-minute emergency backupWould a tri-proof high bay suit the environmental and control requirements?
HBH20/30/53/70/100 W; 3,200–16,000 lm; 160 lm/W; IP65; linkable; optional emergencyIs a lower-output, linkable tri-proof form appropriate for the mounting and zone?

 

These values must be tied to the exact offered model and configuration. The HBG page and current company-confirmed specifications use IP65 and 170 lm/W; older conflicting page cards should not be used. For HB-C, IP69K or food-area claims still need to be checked against the certificate and the covered configuration. A product family table helps narrow candidates, but it does not supply the fixture lumens needed for the calculation until the configured product file is selected.

Best-fit conditions and exclusions

A candidate is a good fit only when its output, optic, protection, control, temperature, installation, and documentation match the zone. Do not infer NSF coverage, emergency duration, control behavior, or a certification for one series from another series. Do not convert 0–10 V total dimming into independent spectral or channel control. If the project needs a non-standard length, optic, power, label, mounting method, or layout, treat it as a project configuration that requires revalidation.

FY project path

FY LIGHTING can support a project-specific layout and DIALux/CAD review. After the client supplies the drawing, dimensions, mounting height, target task, reflectances, environment, voltage, controls, and certification needs, the selected fixture and actual photometric data can replace the preliminary assumptions. A typical review can return candidate fixture configurations, a preliminary quantity, and a layout assessment; exact scope, quotation, and any certification documentation should be confirmed for the project. The result should be reviewed for average, minimum, uniformity, glare, connected load, maintenance, and installation constraints before quotation or release.

Move From the Count to the Right FY Product Family

The preliminary count tells you how much useful light the zone may require; it does not by itself select a product. Use the result together with environment, mounting geometry, optics, and maintenance conditions. The table below is a screening path, not a final recommendation without simulation.

Project conditionFY family to evaluate firstWhat must be confirmed next
Dry open high-bay spaceHB-E or HB-FConfigured lumens, row geometry, mounting height, optic and glare.
Linear rows with lower-output or linkable zonesHBH; also HB-E/HB-F where geometry fitsSpacing, connection method, emergency option, controls and total load.
Moisture or dust exposure requiring IP65 tri-proof formHBG or HBHExact SKU, IP coverage, temperature, sensor/emergency configuration and IES file.
Food-area or high-washdown applicationHB-CApplicable sanitary documentation, exact IP/NSF coverage, optic, cleaning chemistry and certificate scope.
Higher mounting height or unusual rack geometryCompare exact HB-E/HB-F/HBG/HB-C distributionsVertical illuminance, rack obstruction, aiming, minimums and uniformity in a model.

This makes the next action concrete: use the screening count to request the exact configured lumen output and photometric file for the family that matches the environment, then rerun the quantity and layout with those real inputs.

DIALux Validation and Field Check

From estimate to final model

Build at least two layouts from the same project brief. Change one meaningful design variable at a time—fixture family, optic, spacing, row alignment, or quantity—so the comparison remains interpretable. Record the assumptions in the model and preserve the final photometric file with the quotation or submittal.

What to review

  • Maintained average illuminance and minimum illuminance on each relevant work plane.
  • Uniformity and dark zones at aisle ends, corners, edges, and between rows.
  • Vertical illuminance on labels, rack faces, inspection surfaces, and equipment where visibility depends on it.
  • Glare, contrast, direct view of LED sources, and visual comfort for operators.
  • Fixture spacing, mounting access, emergency zones, controls, connected load, and serviceability.

Pilot and field measurement

For a major retrofit or a difficult geometry, install a representative pilot zone or stage the work so the assumptions can be checked before full rollout. After installation, use a calibrated meter and a documented grid appropriate to the task. Record fixture state, dimming level, time, temperature, cleaning condition, measurement height, and the point locations. A field average that looks acceptable does not eliminate the need to investigate minimum values, uniformity, glare, or vertical visibility.

High Bay Light Calculator Inputs and FAQ

Use This Calculator Worksheet Before You Model the Project

Enter one line for each task zone. Calculate preliminary count = (area × target illuminance) ÷ (configured lumens × CU × LLF), then round up. Record the source or assumption for every field; leave uncertain values marked “to be confirmed” rather than silently using a favorable number.

FieldYour valueUnit / source
Zone area ft² or m²; drawing or survey
Target illuminance fc or lux; current criterion and task
Configured fixture lumens lm; exact model and setting
CU manufacturer data or modeled result
LLF maintenance and environment basis
Calculated quantity formula result
Rounded quantity screening result
Configured input watts W; exact model for load check

How many high bay lights do I need per square foot?

There is no universal fixture-per-square-foot value. Square footage is only the area input. Target illuminance, configured lumens, CU, LLF, mounting geometry, optics, and minimum or uniformity criteria determine the count.

How many high bay lights do I need for a 10,000 sq ft warehouse?

Under the illustrative assumptions in this article—20 fc, 30,000 lm per fixture, CU 0.70, and LLF 0.80—the preliminary count is 11.90, rounded to 12. This is not a final recommendation until zones, layout, minimums, and the exact photometric file are checked.

How many lumens do I need for a 20-foot ceiling?

Ceiling height alone cannot determine lumens. You need mounting height above the work plane, target illuminance, optic, room geometry, reflectances, and task surfaces. A 20-foot ceiling with open storage is not equivalent to a 20-foot ceiling over high racks.

How far apart should LED high bay lights be?

Spacing depends on the photometric distribution, mounting height, work plane, row alignment, reflectances, and the required uniformity. Use the manufacturer IES file and compare spacing options in a model; do not apply a fixed spacing ratio across different fixtures.

How many 200W high bay lights do I need?

200 W is not enough information because wattage does not state delivered lumens or distribution. Obtain the exact configured lumens and use them in the formula, then check the input watts separately for connected load and circuit planning.

What is the difference between lux and footcandles?

Both measure illuminance. One foot-candle equals one lumen per square foot; one lux equals one lumen per square meter. The approximate conversion is 1 fc = 10.764 lux. Keep area, target, and formula units consistent.

Can I use the same lighting calculation for high-rack aisles?

Use the same basic lumen-method structure only as a preliminary screen, but not the same assumptions automatically. High racks can block horizontal and vertical light, so model aisle geometry, rack faces, vertical work planes, minimum illuminance, and uniformity separately.

Does a higher wattage mean I need fewer fixtures?

Not necessarily. Higher wattage may provide more lumens, but the result depends on efficacy, optic, temperature, mounting position, glare, and distribution. Compare configured lumens and modeled performance, then evaluate connected load and maintenance.

When is a DIALux lighting simulation necessary?

Use it whenever geometry, mounting height, racks, task zones, minimums, uniformity, glare, vertical visibility, or compliance matters. It is especially important for large facilities, high racks, unusual optics, or a purchase decision where the arithmetic count could be misleading.

What should I send for a model-specific calculation?

Send the plan, dimensions, mounting height, task zones, target criteria, rack or equipment layout, reflectances if known, environment, voltage, controls, certification needs, and schedule. FY LIGHTING can then evaluate candidate configurations, preliminary quantity, and layout scope; exact deliverables and quotation should be confirmed for the project.

Conclusion: Use the Calculator to Start, Not to Finish

The lumen method gives a transparent first estimate: area multiplied by target illuminance, divided by configured lumens, utilization, and light-loss assumptions. Its value is that every assumption is visible and sensitivity can be tested. Its limit is that average lumens do not describe the complete spatial distribution of light.

For a defensible high-bay design, define separate task zones, select candidates by environment and exact configuration, compare quantity and spacing, validate the IES file in DIALux or equivalent software, and measure representative points after installation. If you want FY LIGHTING to review a project, provide the drawing, dimensions, mounting height, target task, reflectances, operating environment, voltage, controls, and certification requirements. The team can then evaluate the appropriate product family and project-specific layout without turning a preliminary calculator result into an unsupported promise.

Sources and Further Reading

Illuminating Engineering Society: Coefficient of Utilization (CU) — https://www.ies.org/definitions/coefficient-of-utilization-cu

U.S. Department of Energy: Light Loss Factors and LED Lighting — https://www.energy.gov/sites/prod/files/2014/10/f18/royer_salc2014.pdf

FY LIGHTING: Industrial LED Lighting — https://www.fytechsystems.com/led-industrial-light/

FY LIGHTING: HBG LED Tri-Proof High Bay Light — https://www.fytechsystems.com/led-tri-proof-light-hbg/

FY LIGHTING: HB-E Linear High Bay Light — https://www.fytechsystems.com/led-linear-high-bay-e/

FY LIGHTING: HB-F Linear High Bay Light — https://www.fytechsystems.com/led-linear-high-bay-f/

FY LIGHTING: Food-Grade LED Lighting — https://www.fytechsystems.com/food-grade-led-lights/

DIALux: Lighting design software and documentation — https://www.dialux.com/

FY Lighting — Professional LED Solutions for Every Industry

FY Lighting specializes in high-performance LED systems for industrial, explosion-proof, and agricultural applications. From factory lighting to vertical farming solutions, we help clients worldwide achieve safety, efficiency, and sustainability.
en_USEnglish
Scroll to Top